|
Time to install the new pump. Use the spacers provided and the original bolts. Mount inside the bracket that held the factory pump.
Install the high pressure line into the steering box and into the fitting on the back of the PSC pump.
Run the 3/8" return line from the steering box back to the new reservoir shelf we installed. Leave a bit of excess at that end. Position the sleeves to protect the line from the heat of the high pressure hose or any other point where it needs a bit of protection.
|